欧美xxxxx做受vr_亚洲人成无码网WWW_亚洲毛 天天影视色香欲综合久久_表妺好紧竟然流水了在线观看_

Hello, welcome to visit the official website of Liaoning Qianfeng Steel Plastic Pipe Manufacturing Co., Ltd.!

news

Product

contact us

Liaoning Qianfeng Steel Plastic Pipe Manufacturing Co., Ltd.

Address: Dawa Lingang Economic Zone, Panjin City

Website: www.gdhbjg.com


Sales of a company

General Manager: Zhao Lei 18241448558

Sales Minister: Liu Wenli 18841483313

Sales Second Company

General Manager: Zhao Shuxiu 13188225517

Sales Minister: Pei Xiaojun 13804148185

Sales three companies and foreign trade

General Manager: Dai Gang 13604976693

Sales Minister: Chen Liming 18524274505

Sales four companies

General Manager: Chen Tieyan 18341472200

Sales Director: Meng Lin 19904144892

Installation specifications for PE pipes

Your current location: Home >> News >> Company News

Installation specifications for PE pipes

Date of release:2017-12-14 Author: Click:

How much do you know about the installation and operation specifications of PE pipes? Friends who have used PE pipes all year round should be familiar with the installation operation. For large-caliber water supply pipes, we will come to familiarize ourselves with this operation today.


1. Check the pipes, pipe fittings and pipe accessories before connecting the pipes, according to the design requirements, and inspect the appearance and quality before construction, and use them only if they meet the requirements of the standard.


2. General pipes, pipe fittings and pipe accessories are connected by hot melt or mechanically. When the nominal outer diameter of the pipe is greater than or equal to 110mm, manual hot melt socket connection cannot be used, and threaded connection cannot be used for polyethylene pipes and pipe fittings.


3. If polyethylene pipes belong to different SDR pressure grade series, they cannot be connected by hot-melt butt joints. When connecting pipes with metal pipes or metal pipe accessories, flanges or steel-plastic transition joints should be used for connection.


4. Special connection tools should be used when connecting pipelines, and it is strictly forbidden to heat the pipelines with open flames.


5. The pipes and pipe connections should be of the same grade and the same pressure grade. When pipes and pipes of different grades are connected, they should be tested first, and the connection can be made after the quality can be guaranteed.


6. When using steel sprayed plastic or ductile iron transition pipe fittings, the pressure grade of the transition pipe fittings cannot be lower than the nominal pressure of the pipe.


7. When performing hot-melt connection operation, if it is in a cold climate or a strong wind, protective measures should be taken.

大口徑給水管材

  

8. Special cutting tools should be used for pipe cutting, and the cutting section should be flat, smooth, free of burrs, and perpendicular to the pipe axis. After the pipeline is connected, the appearance quality of the joint should be checked in time. If the inspection fails, it must be reworked until it is qualified.


PE pipe is a non-polar thermoplastic resin with high crystallinity. The appearance of the original HDPE is milky white, and the thin section is translucent to a certain extent. PE has excellent resistance to most domestic and industrial chemicals.


The address of this article:http://www.gdhbjg.com/en/news/360.html

Key word:聯(lián)塑鋼塑復(fù)合管,連塑鋼塑復(fù)合管,涂塑鋼塑復(fù)合管

Recently browse:

Please leave a message for us
Please input the message here, and we will contact you as soon as possible.
name
Contacts
Telephone
Telephone
mailbox
mailbox
address
address