Hello, welcome to visit the official website of Liaoning Qianfeng Steel Plastic Pipe Manufacturing Co., Ltd.!
Liaoning Qianfeng Steel Plastic Pipe Manufacturing Co., Ltd.
Address: Dawa Lingang Economic Zone, Panjin City
Website: www.gdhbjg.com
Sales of a company
General Manager: Zhao Lei 18241448558
Sales Minister: Liu Wenli 18841483313
Sales Second Company
General Manager: Zhao Shuxiu 13188225517
Sales Minister: Pei Xiaojun 13804148185
Sales three companies and foreign trade
General Manager: Dai Gang 13604976693
Sales Minister: Chen Liming 18524274505
Sales four companies
General Manager: Chen Tieyan 18341472200
Sales Director: Meng Lin 19904144892
In many engineering constructions, PE pipes, PVC pipes, and PPR pipes are used at the same time. Large-diameter plastic-coated steel pipes PE pipes and PPR pipes are connected by hot melt, while PVC pipes are generally connected by glue, while PE Due to the different performance of PPR pipes, the two cannot be directly connected. What is needed if you want to connect the two?
PE pipes and PPR pipes can generally be directly connected to each other with internal teeth and external teeth, and the accessories on the market are relatively complete.
When connecting PE pipes and PVC pipes, you can consider using flange connections. If it is a drainage project, you can consider using PE socket fittings to directly connect with the PVC pipes. If the glue is good, it can also be sealed.
Flange connection is to fix two pipes, pipe fittings or equipment on a flange plate respectively, then add a flange gasket between the two flange plates, and finally tighten the two flange plates with bolts. It is a detachable joint that is tightly integrated.
In short, PE pipes are mainly used in water supply engineering in actual construction applications. In case of pressure, internal teeth, external teeth fittings or flange connections must be used to ensure the quality of the project.